1.
Zakaria Z, Deris S, Othman MR, Kasim S. Non-Reshuffle-Based Approach for Rescheduling of Flexible Manufacturing System. Int. J. Adv. Sci. Eng. Inf. Technol. [Internet]. 2017 Sep. 26 [cited 2024 Jul. 3];7(4-2):1543-52. Available from: https://ijaseit.insightsociety.org/index.php/ijaseit/article/view/3464