Project Risk Patterns: A Comparison Across Three Periods
How to cite (IJASEIT) :
Fachrurrazi, S. Husin, Munirwansyah, and Husaini, “The Subcontractor Selection Practice using ANN-Multilayer,” International Journal of Technology, vol. 8, no. 4, p. 761, Jul. 2017.
S. Nazara, B. P. Resosudarmo, “Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006, 2007,” ADB Institute Discussion Paper, No. 70, 2007.
L. M. Khodeir and A. H. M. Mohamed, “Identifying the latest risk probabilities affecting construction projects in Egypt according to political and economic variables. From January 2011 to January 2013,” HBRC J., vol. 11, no. 1, pp. 129-135, Apr. 2015.
H. Abdul-Rahman, C. Wang, and F Sheik Mohamad, “Implementation of Risk Management in Malaysian Construction Industry: Case Studies”. J. Constr. Eng. 2015.
M. S. B. A. Abd El-Karim, O. A. Mosa El Nawawy, and A. M. Abdel-Alim, “Identification and assessment of risk factors affecting construction projects,” HBRC J., Jun. 2015.
Fachrurrazi, S. Husin, Tripoli, and Mubarak, “Neural Network for the Standard Unit Price of the Building Area,” Procedia Engineering, vol. 171, pp. 282-293, 2017.
Z. Sigmund and M. Radujković, “Risk Breakdown Structure for Construction Projects on Existing Buildings,” Procedia - Soc. Behav. Sci., vol. 119, pp. 894-901, Mar. 2014.
B. T. Saragiotto, T. P. Yamato, L. C. Hespanhol Junior, M. J. Rainbow, I. S. Davis, and A. D. Lopes, “What are the main risk factors for running-related injuries?,” Sports Medicine, vol. 44, no. 8. pp. 1153-1163, 2014.
K. M. Baroang, M. Hellmuth, and P. Block, “Discussion Paper Identifying uncertainty and defining risk in the context of the WWDR-4” Perugia, Italy, (2009).
G. M. Sullivan, “A primer on the validity of assessment instruments.” J. Grad. Med. Educ., vol. 3, no. 2, pp. 119-20, Jun. 2011.
M. M. Hossen, S. Kang, and J. Kim, “Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project,” Nucl. Eng. Technol., vol. 47, no. 3, pp. 362-379, Apr. 2015.
J. D. Brown, "Likert items and scales of measurement." Shiken: JALT Testing & Evaluation SIG Newsletter 15, no. 1, pp. 10-14, (2011).
DASDSE, “Risk, Issue, and Opportunity Management Guide for Defense Acquisition Programs,” 2015.
H. Dezfuli, A. Benjamin, C. Everett, G. Maggio, M. Stamatelatos, and R. Youngblood, “NASA Risk Management Handbook,” no. November, p. 15, Nov. 2011.
F. D. Control et al., “Guidelines for Risk Management Guidelines for Risk Management Rationale for Change,” pp. 1-40, 2014.
L. Jodkowski, “Possibilities and Methods of Risk Assessment under ISO 9001 : 2015,” vol. 3, no. 10, pp. 14-23, 2015.
P. Zeccola, “Dividing disasters in Aceh, Indonesia: Separatist conflict and tsunami, human rights and humanitarianism,” Disasters, vol. 35, no. 2, pp. 308-328, Apr. 2011.
N. D. Long, S. Ogunlana, T. Quang, and K. C. Lam, “Large construction projects in developing countries: A case study from Vietnam,” Int. J. Proj. Manag., vol. 22, no. 7, pp. 553-561, 2004.
A. Giddens, "Risk and responsibility." The modern law review, vol. 62, no. 1, pp. 1-10, 1999.
F. Steinberg, “Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia-Rebuilding lives,” Habitat Int., vol. 31, no. 1, pp. 150-166, 2007.
K. H. Rose, “A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Fifth Edition.” Proj. Manag. J. 2013.
Fachrurrazi, “Study of Unit Price for Competitive Bidding Based on CCI (Construction Cost Index) for Building” Int J Eng Res. 2016.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).